Green power and plus energy house
Everyone wants to drastically reduce CO2 emissions!
All new buildings from 2024 onwards must comply with the standard Plusenergyhousecorrespond! There is only this new building version! Existing buildings can be retrofitted. A credit line should be available here.
- Green electricity from PV, wind, and hydropower are available to the power grid! As long as there is no real surplus of electricity from PV,wind, bio mass and hydropower. Maybe from 2030?
- Any form of hydrogen production from biomass, except H2 by electrolysis are promoted!
- Coal power plants go off the grid ASAP
- Ban on shutdown of wind power plants, PV limitation to 70%, 100% feed-in ALWAYS possible Ex: Record PV feed-in - Electricity generation and electricity trade in June 2021 Electricity consumption was 8.0 percent higher than in the same month last year. Therefore, there was a net import in commercial foreign trade!
- Coal-fired power plant operators must convert their surplus electricity into hydrogen via electrolysis at their own expense. There are enough profits! They have had over 20 years to change this!
- The private feed of hydrogen is promoted immediately legally HPS LAVO and there are certainly still more.
- No further expansion of power lines necessary with aSolarHydrogen economy necessary!
- Local electricity suppliersoffer cheap electricity as in the atomic age 60s with electricity surplus. Thus the 70% regulation PV, and the shutdown of wind power plants is omitted. A legal regulation is missing here still!
Today with it begin, and our children grandchildren and following generations say perhaps: What a luck, in the last moment still changed!
- Energy-intensive industries receives Hydrogen Filter
- Fastest development of the hydrogen economy until 2031 possible and realizable